Cost savings

Traditionally, rolls are changed at given intervals or sometimes even as a result of failure. This may entail higher costs than necessary. Using the Rollprof PM 1000 means that rolls need only be changed when their condition requires it, thus allowing considerable cost savings right from the start.

Rollprof 3T